Onwan عنوان العربية

Developer guide · October 2026

Buying from LMD — prices, payment plans & delivery

Quick answer

LMD has 7 compounds across 3 areas, from about 10.5M EGP (~182,556 EGP/m²). Down payments start at 5% with plans to 8 years. 4 of their compounds are ready or delivering this year.

Figures checked on .

Want the units behind this answer?Pick your budget and we’ll reply on WhatsApp with what’s available today and the payment plans.
Compounds
7
From
10.5M EGP
Down from
5 %
Plans to
8 yrs

How they structure payment

These are the distinct plan shapes published across LMD compounds — the down payment, the instalment it implies and how long it runs.

Down paymentInstalment fromPlan lengthCompounds
5%from 535K EGP43KQuarterly8 yrs4
10%from 1.8M EGP675KQuarterly6 yrs3
10%from 2.5M EGP1MQuarterly5 yrs1
15%from 3.6M EGP1.7MQuarterly3 yrs1
20%from 4.7M EGP1.2MQuarterly4 yrs2
20.35%from 1.5M EGP304KQuarterly4.8 yrs1

Like one of these? Ask on WhatsApp for today’s price and availability

Each row is one plan shape, not one unit: the down payment and instalment shown are the lowest on that shape across their compounds, and may come from different units. Ask for the schedule on the unit you want.

Where they build

AreaCompoundsFromEGP/m²Plan
New Cairo58M181,0268
Mostakbal City14.6M39,8765.3
Ghazala Bay115.9M186,6678

Delivery record

Handover across LMD's tracked projects runs from 2024 to 2027, with 4 compounds ready or delivering this year. We record scheduled dates from current listings — always confirm the contractual date in your own agreement.

Where they sit in the market

At 182,556 EGP/m² they price about 91% above the national median of 95,388. That usually reflects where they build and at what specification rather than a premium for the name alone — compare them inside a single area before concluding they are expensive.

Their portfolio is mixed: 10 residential listings against 9 commercial. If you are buying to live, filter to the residential stock — commercial units here are an investor product with different demand and a different exit.

On unit mix they lean toward larger family units — 5 compounds list four bedrooms or more against 3 listing two or fewer.

What that actually costs
Unit price4.6M
Down payment (5%)230K
Balance over 8 yrs4.4M
Per month46K

Interest-free, as Egyptian developer plans are. Maintenance and club fees are separate and are not included here.

What to check before you commit

Confirm the plan in writing. Published down payments are often introductory and attached to specific units or phases. Get the schedule, the instalment amount and the frequency on the contract, not the brochure.

Ask what is separate. Maintenance, club membership and parking are usually charged on top and are not in any price on this page.

Check the delivery date contractually. A date in a listing is a plan; a date in a contract is an obligation. On off-plan stock this is the single most consequential line in the agreement.

Visit at the hour you would actually live it. Drive the commute at rush hour and walk the compound on a weekday evening. Both tell you more than any specification sheet.

Their compounds

0 shown

All LMD listings → · Compare developers →

Did LMD prices go up since September?

As of , the 17 LMD homes listed in both the 10 September 2026 and 30 October 2026 snapshots ask a per-m² price that is unchanged (median same-home change 0.0%): 6 rose, 2 fell and 9 kept their price.

Across every LMD home listed, the median asking price is 183,333 EGP/m² over 17 homes, against 179,000 EGP/m² over 19 in September 2026 (2.4% up). That median moves with the mix of homes listed (new phases, other sizes), so the same-home figure above is the better guide to price moves.

The full October 2026 market report →

Frequently asked

Did LMD prices go up since September?

As of 31 October 2026, the 17 LMD homes listed in both the 10 September 2026 and 30 October 2026 snapshots ask a per-m² price that is unchanged (median same-home change 0.0%): 6 rose, 2 fell and 9 kept their price. Across every LMD home listed, the median asking price is 183,333 EGP/m² over 17 homes, against 179,000 EGP/m² over 19 in September 2026 (2.4% up). That median moves with the mix of homes listed (new phases, other sizes), so the same-home figure above is the better guide to price moves.

What is the down payment for LMD?

The lowest published down payment across their compounds is 5%, and the most common shape is around 12.5%. Treat the lowest figure as an offer on specific units rather than the standard.

How long are LMD payment plans?

Up to 8 years, paid quarterly. Longer tenors usually attach to the newer launches rather than the ready stock.

Where does LMD build?

Across 3 areas — most heavily in New Cairo, Mostakbal City, Ghazala Bay.

Is LMD delivering on time?

We track handover dates rather than promises: their tracked projects hand over between 2024 and 2027, and 4 of 7 compounds are ready or delivering this year. That is a record of scheduling, not a guarantee — ask for the contractual delivery date in writing.

What does LMD build?

Their tracked stock is mostly Administrative (4), Apartments (2), Villas (2), Twinhouses (2), Townhouses (2).

Interested in a LMD project?

Tell us the area and budget and we'll send what they have available now, with the full payment schedule.

We use your number to answer this enquiry. No lists, no spam.

Chat on WhatsAppWe answer 24/7
WhatsApp 24/7Call me back