Receiving your apartment: the handover inspection checklist
At handover, inspect the unit against your contract before you sign the handover report (محضر الاستلام): the area, the finishing annex, walls and ceilings, damp, plumbing and water pressure, electrics and every socket, doors and windows, meters, and the common areas (on , 93% of the 4,832 new-build homes we track deliver after 2026). Write every defect in the report or in a signed annex and ask for a repair date; once you sign "received in good condition" it is harder to claim. Reviewed 31 October 2026. In October 2026, 956 new homes for sale were due in 2026 or 2027, and 45% of new homes are sold core-and-shell or semi-finished, where the inspection is mostly about structure, levels and connections.
How do I inspect the unit, step by step?
- Get the handover notice in writingIt should give the date, what you must pay before handover (often the last instalment and the maintenance deposit) and the documents to bring.
- Bring the contract, annexes and a helperThe floor plan, the finishing annex and, if you can, an engineer or an experienced finisher. A laser meter, a spirit level and a phone charger to test sockets help.
- Measure the areaMeasure the rooms and compare with the plan. If the contract area includes a share of common areas, ask how it was calculated.
- Check walls, ceilings and dampCracks, uneven plaster, stains or damp near bathrooms, kitchens and the roof. Check after rain or ask to run water upstairs if you can.
- Test water and drainageOpen every tap, flush every toilet and fill every basin: pressure, hot water, leaks under sinks and slow drains.
- Test electricsEvery socket and switch, the distribution board labels, earthing, and the AC and water-heater points shown in the annex.
- Check doors, windows and finishingDoors and windows close and lock, glass is intact, tiles are level and not hollow, and brands match the finishing annex.
- Note the meters and common areasMeter numbers and readings, the lift, stairs, entrance and parking promised in the contract.
- Write every defect before you signList defects in the handover report or a signed annex, with photos and a repair date. Keep a copy of everything you sign.
What should I bring?
| Bring | Why |
|---|---|
| Contract, floor plan, finishing annex | To check the unit against what you bought |
| Payment clearance (مخالصة) | Proof that what is due before handover is paid |
| Laser meter, spirit level, phone charger | Area, levels and sockets |
| Engineer or finisher (optional) | Spots what you would miss; agree the fee beforehand |
How finished will my unit be?
4,832 new-build homes with a finishing level, October 2026.
When to see a lawyer
If the area is clearly smaller than the contract, if the finishing does not match the annex and the developer will not fix it, or if you are asked to sign a waiver of later claims.
Frequently asked
What should I check when receiving an apartment from the developer?
The area against the plan, walls and ceilings, damp, water and drainage, electrics and sockets, doors and windows, the finishing against the annex, meters and the common areas. Write every defect in the handover report before you sign.
Can I refuse to receive the unit?
If it does not match the contract, you can record the defects and refuse to sign as received in good condition. What happens next depends on your contract, so keep everything in writing and ask a lawyer if the developer will not fix them.
What do I pay at handover?
Usually any handover instalment in your plan, the maintenance deposit (typically 8% of the price) and the meters. Check your schedule.
Receiving a unit soon?
Tell us the compound; we'll send a checklist for that developer's finishing.
Onwan, “Receiving your apartment: the handover inspection checklist”, 31 October 2026. https://on-wan.com/guide-handover-inspection
Figures are medians of asking prices for new-build units. Please cite the page and its date, so readers see the edition you used.